Reena Patel
Partner
Article
A recent High Court judgment provides important and novel guidance on the scope of landlords' covenants in commercial leases, particularly in the context of fire safety defects arising from combustible cladding.
In Essendi UK Hotels 2 Limited v London Property Company Limited [2026], the Technology and Construction Court (TCC) held that a landlord’s covenant to "put and keep" the building in “good and substantial repair and condition” extended to an obligation to remove and replace highly combustible aluminium composite material (ACM) cladding panels, even in the absence of physical disrepair.
This case is significant because:
While the fact matrix in this case was unusual, it will be of interest to landlords and leaseholders of commercial buildings outside the scope of the Building Safety Act 2022 (BSA), including hotels, with fire safety or cladding defects. Given the potential impact of this decision, readers should watch out for any sign of an appeal to the Court of Appeal.
As explained in our recent video unpacking what hotel owners need to know about building safety, hotels are excluded from the definitions of "higher-risk buildings" and "relevant buildings" under the BSA. Thus – as the judge observed in this case – it was not open to Essendi (the tenant) to seek a remediation order under the BSA, as it could have done had the building in question been a residential tower block above the height threshold.
Previous case law has established that an obligation to repair can only apply where there is a disrepair (e.g. a deterioration from some previous physical condition). The Court held that although the cladding was not in physical disrepair, the “condition” limb of the landlord’s covenant was broader than the “repair” limb.
Applying the principle in Credit Suisse v Beegas Nominees Ltd [1994], the judge held that the covenant required the landlord to put and keep the building in a condition "which, given the property's age, character and locality and, in particular, as a tower block exceeding 18 metres in height intended and required to be used as a hotel, would make it reasonably fit for such use as regards fire safety risks".
The Court rejected arguments based on cost (£5–7 million), the (subjectively) short length of the lease term (12 years), the absence of physical manifestation of the defect, and the contention that replacement would give the tenant something “completely different” from what was demised.
The FSO applies to all workplaces and the common parts of buildings containing 2 or more domestic premises. It imposes legal duties on the "responsible person" who has "control" of such premises.
The Court held that LPC was in breach of the legal obligations provisions in the lease, read with the FSO. LPC was found to be a “responsible person” under the FSO in relation to the structure and exterior (including the cladding), and its duties under articles 8, 10 and 12 of the FSO required replacement of the Category 3 ACM panels. The Court rejected LPC’s argument that the FSO’s enforcement regime prevented contractual enforcement, holding that sufficiently clear lease provisions can make statutory duties actionable between the parties.
The Court ordered LPC to: (a) remove the Category 3 ACM cladding panels within 6 months; and (b) complete re-cladding within an overall period of 18 months, all at LPC’s own cost.
The Court held that Essendi’s decision to close the hotel was caused by LPC’s breaches, was reasonable in all the circumstances, and entitled Essendi to proceed to an assessment of damages.
Finally, those procuring new-build hotels, hotels formed by material change of use, or recladding works to hotels which are over 18 metres in height should keep in mind the ban on combustible materials introduced by the Building (Amendment) Regulations 2018 – which was extended in 2022 to cover hotels, hostels and boarding houses. As a result of the extension, materials in the external wall of buildings falling into those categories must meet the same performance requirements as the higher risk buildings previously covered by the ban i.e. A2-s1, d0 or better.
If you have any queries on this article, please get in touch with Reena Patel, Gemma Whittaker or Brett Mason.
CECI NE CONSTITUE PAS UN AVIS JURIDIQUE. L'information qui est présentée dans le site Web sous quelque forme que ce soit est fournie à titre informatif uniquement. Elle ne constitue pas un avis juridique et ne devrait pas être interprétée comme tel. Aucun utilisateur ne devrait prendre ou négliger de prendre des décisions en se fiant uniquement à ces renseignements, ni ignorer les conseils juridiques d'un professionnel ou tarder à consulter un professionnel sur la base de ce qu'il a lu dans ce site Web. Les professionnels de Gowling WLG seront heureux de discuter avec l'utilisateur des différentes options possibles concernant certaines questions juridiques précises.
Gowling WLG est un cabinet juridique international constitué des membres de Gowling WLG International Limited, une société à responsabilité limitée par garanties enregistrée en Angleterre, ainsi que leurs affiliés respectifs. Les membres et affiliés constituent des entités autonomes et indépendantes. Gowling WLG International Limited promeut, facilite et coordonne les activités de ses membres, mais ne fournit pas elle-même de services aux clients. Pour en savoir davantage sur notre structure, consultez notre page Avis juridique.